News

Invitation to the VDI expert forum

Component development using neutron beams [more]

On July, 15th the reactor was shutdown after 52 days of successful operation. [more]

On Wednesday the 24.05.2006 the 7th reactor cycle started at the research neutron source Heinz Maier-Leibnitz. More than 70 experiments are planed out of which 22 stem from international collaborations. During the next 52 days measurements will take place 24h a day simultaneously... [more]

Workshop: Neutrons in Geo Science 14.7.2006

[more]

Annual report 2005 is available now

[more]

Not even one months after the inauguration of the Jülich Center for Neutron Science JCNS, the first neutron spectrometer arrived on March 15th at the Forschungsneutronenquelle Heinz Maier-Leibnitz (FRM II) in Garching. After the decision of the Forschungszentrums Jülich to shut... [more]

Wednesday, 1.3.06 the reactor was shut down after the regular end of the 5th cycle. The 6th cycle is scheduled for start-up on 24.3.06. The break between the 2 cycles will  be used for routine tests and for installation of new neutron guide systems. [more]

Successful Start of Routine Operation at FRM II [more]

The reactor has been shut down on Sunday, 22.01. 2006 due to a warnig signal in the secondary cooling system, where the cause can not be checked during power operation. This procedure is in accordance with the operating guidelines (BHB) for the FRM-II. The directorate of the... [more]

Das Neutronen-Röntgen-Konstrast-Reflektometer N-REX+ wurde am 24.11.2005 eingeweiht. The neutron / X-ray contrast reflectometer N-REX+ was inaugurated on 2005-11-24. [more]