Skip to content
  • Career
  • Phone book
  • Events
  • MLZ Webpage
  • MLZ User Office
  • Webmail (internal)
  • Webmail ("Betrieb")
  • Intranet
  • de
  • en
  • Research Neutron Source Heinz Maier-Leibnitz (FRM II)
  • Technical University of Munich
Technical University of Munich
  • Home
  • About us
    • From "Atomic Egg" to FRM II
    • Facts & Figures
      • Auftragsvergaben
    • News & Media
      • News article
      • Films
        • Interactive panorama
      • Brochures
        • Annual Reports
        • Newsletter
      • Events
        • Open day 2024
    • Contact
  • The Neutron Source
    • Neutrons
    • Fuel elements
      • Life cycle of a fuel element
      • Disposal of fuel elements
        • FRM II fuel element
        • Storage in Ahaus
        • Secure packaging
        • Transport vehicle
        • Permits
        • Function test
        • FAQ
      • Conversion
        • What does the conversion entail
        • Objectives of the conversion
        • Who is working on the conversion?
        • Fact check
    • Reactor
      • Installations in the pool
      • Guiding the beams
        • Cooling circuits
    • Irradiation facilities
      • Rabbit Irradiation
      • Capsule Irradiation
      • Mechanical Irradiation
      • Irradiation Position in the Control Rod
      • Irradiation with fast neutrons
      • Future Mo-99 irradiation facility
    • Safety
  • Safe all round
    • Protection of persons
    • Monitoring the facility
    • Monitoring the environment
      • Discharge of C-14
  • Research
  • Medicine
    • Radioisotopes for diagnostics
    • Radioisotopes for therapy
    • Tumor irradiation
  • Industry
    • Materialanalyse
      • TUM-Expertenforen
      • VDI Fachausschuss 101
        • Bildgebende Verfahren
        • Optische Messverfahren
        • Eigenspannungs- und Texturanalyse
        • Analytik
      • Analysis with neutrons
    • Radioisotopes for industry
    • Silicon doping
  • Career
  • Guided Tours
  1. Home
  2. About us
  3. News & Media
  4. News article

News

Channel for service pipes

29.07.2014

There are underground constructions on the site of the FRM II. Workers build a new underground channel for service pipes in preparation of the new buildings for offices, laboratories and workshops in front of the Atomic Egg.

The first part of the walkable channel is prepared for concreting. (Photo: W. Schürmann / TUM)
The first part of the walkable channel is prepared for concreting. (Photo: W. Schürmann / TUM)

29.07.2014

The new channel will be walkable and will house pipes for heating, water, electricity and telecommunications, which will serve the future new buildings in front of the Atomic Egg. The construction company Mickan is excecuting the works according to plans of the Bavarian Building Authority. For the first part of the channel 60 tons of steel and 270 cubic metres of concrete used according to the site foreman.

The second part of the channel will go around the corner to the former buildings in front of the Atomic Egg. They will soon be torn down to make room for the new buildings including offices, workshops and laboratories.


◄ Back to: News article
To top
  • Privacy
  • Imprint
  • Accessibility