The reson for the interruption was a probable damage in the mounting of one of the secondary cooling pumps. This was detected by the permanent monitoring. The part of the pump is now replaced by an existing spare part as a precautionary measure. All other systems could be used without further restrictions. The missed two operation days will be added at the end of the cycle.